CI

At a glance

ClinicalIndex Comparison Record
N/ACompleted· 76 enrolled
Drug / intervention
AnapnoGuard 100 control unitdevice
Likely dose
Not stated in record
Structured eligibility isn't available for this trial yet — see the full criteria in the Eligibility tab below.

Standardized by ClinicalIndex from the ClinicalTrials.gov record · verify against the source.

Search/NCT01857986
NCT01857986N/ACompleted

A Study to Evaluate Air Leak Detection Above the Endotracheal Cuff in Intubated Patients Using the AnapnoGuard 100 System

Hospitech Respiration·interventional·Posted May 20, 2013·Updated Jun 19, 2017

In Brief

A clinical study evaluating AnapnoGuard 100 control unit for Critical Care. Completed, enrolled 76 participants across 4 sites.

Detailed Summary

This trial is designed to assess the effectiveness of the AnapnoGaurd 100 system relative to standard of care (SOC) Control, in the course of mechanical ventilation and intubation. The main effectiveness aspect of this trial is the AnapnoGaurd 100's ability to reduce leaks between the endotracheal tube and the trachea walls as a result of the cuff pressure management. Since the primary outcome can't be measured by any method other than the investigational device, the study groups will be treated as follows: * The Treatment group in this study will be treated with the fully functional AnapnoGaurd 100 device (per its intended use), * The Control group will be treated with the AnapnoGuard device, where the cuff control will be disabled (off) and the cuff management will be done according to SOC. Effectiveness will be measured by the duration and level of carbon dioxide (CO2) leakage around the endotracheal tube (ETT) cuff, from the lungs to the subglottic space and safety will be measured by adverse events (AEs).

Study Details

Study Typeinterventional
Allocation--
Masking--
Primary Purpose--
ConditionsCritical Care
CountriesIsrael
Collaborators--

Timeline

N/ACompletedFinished
2014201520162017201820192020202120222023202420252026
First PostedMay 20, 2013
Enrollment StartSep 1, 2013
Primary CompletionMar 1, 2015
Study CompletionJun 1, 2015
TodayJul 2, 2026
Enrollment to primary: 1.5 yearsPosted 13.1 years ago

Interventions

AnapnoGuard 100 control unitdevice