CI

At a glance

ClinicalIndex Comparison Record
N/ACompleted· 330 enrolled
Drug / intervention
Shu Bei Kang (China) Midline Cathetersdevice
Likely dose
Not stated in record
Structured eligibility isn't available for this trial yet — see the full criteria in the Eligibility tab below.

Standardized by ClinicalIndex from the ClinicalTrials.gov record · verify against the source.

Search/NCT04601597
NCT04601597N/ACompleted

Midline Catheter Tip Position and Catheter-Related Complications in Antimicrobial Therapy- A Multi-centre Randomized Controlled Trial

Sir Run Run Shaw Hospital·interventional·Posted Oct 26, 2020·Updated Feb 22, 2023

In Brief

A clinical study evaluating Shu Bei Kang (China) Midline Catheters for Infection. Completed, enrolled 330 participants across 6 sites.

Detailed Summary

The research protocol was based on assigning patients to three different catheter tip groups and then observing the relationship between the tip and catheter-related complications when infusing antimicrobial agents.

Study Details

Study Typeinterventional
Allocation--
Masking--
Primary Purpose--
ConditionsInfection
CountriesChina
Collaborators--

Timeline

N/ACompletedFinished
202120222023202420252026
First PostedOct 26, 2020
Enrollment StartAug 12, 2020
Primary CompletionDec 30, 2020
Study CompletionJan 30, 2021
TodayJul 2, 2026
Enrollment to primary: 5 monthsPosted 5.7 years ago

Interventions

Shu Bei Kang (China) Midline Cathetersdevice

The procedures ① evaluation and selection of blood vessels: select the puncture vein in the middle of the patient's upper arm, ② Skin disinfection and towel laying: take the supine position, extend the upper limb to be punctured 45 \~ 90 °, disinfect the pre punctured upper limb with 75% alcohol and 5% povidone iodine. ③ Puncture vein: tie a tourniquet to fill the vein. Before puncture, use 0.2 \~ 0.4 ml of 2% lidocaine for local anesthesia. Under the guidance of ultrasound, use the puncture needle in the improved sedinger assembly for puncture. After successful puncture, insert the guide wire. ④ Delivery and confirmation of catheter position: after successful puncture, insert the dilator catheter sheath assembly, withdraw the setinger guide wire, deliver the catheter, after catheter placement, flush and seal the catheter with normal saline, and fix the catheter with sterile dressing.